Building permit

Building permit

The Building Act introduced a single type of permit for construction: the building permit. The building permit assesses both the conditions for siting (compliance with the local development plan or master plan and the formation of a building site within a planning requirement area) and the conditions for implementation (the technical requirements for the actual construction or the technical requirements for the project) in a single permit decision.

If the applicant so requests, the conditions for siting may be examined by means of a separate decision (building permit for the conditions for siting). In such cases, a separate building permit is then required for the actual construction work (building permit for the conditions of construction).

Planning permission for new-build projects

Under the Building Act, a building project requires a planning permission if the property is

  1. a residential building (permanent or holiday home), regardless of its size
  2. a building with a floor area of at least 30 square metres or a volume of at least 120 cubic metres (the volume criterion applies if the building allowance in the local plan is specified as a volume)
  3. a canopy measuring at least 50 square metres
  4. a public building capable of accommodating at least five individuals at any one time, excluding temporary event structures that remain in place for a maximum of three months
  5. a mast or tower at least 30 metres high
  6. an illuminated advertising display measuring at least 2 square metres
  7. energy well
  8. an area to be developed for a specific purpose, which will have an impact on the use of the surrounding areas.

The construction of a new building also requires planning permission if

  • the construction has a more significant impact on land use, the townscape, the landscape, cultural heritage or environmental considerations
  • Construction requires regulatory oversight to ensure that essential technical requirements are met, or
  • It is necessary for the building control authority to supervise the construction of a building project in the public interest. 

The need for planning permission in such cases is assessed on a case-by-case basis, so building plans are required as the basis for the assessment.

Section 7 of the Municipal Building Regulations sets out the types of building works that may be carried out without a planning permission, subject to certain conditions. The requirements for planning permission are also explained in the explanatory notes to the Building Regulations. You can view the municipal Building Regulations and their explanatory notes here.

Planning permission for alterations or renovation work

A permit is required for repair and alteration work if

  • repair and alteration work is comparable to the construction of a building
  • this involves extending the building or increasing the floor area
  • The repair is aimed, to a greater extent than a minor one, at eliminating the health hazard identified in the area where the work is to be carried out
  • the load-bearing structure in the area of the works has been damaged
  • repair work may jeopardise the health or safety of the building site
  • the renovation has a significant impact on the townscape, the landscape or the cultural heritage.

A permit is always required for repair and alteration work if

  • a building that is protected under a planning scheme or by law, or that is of historical or architectural value, is repaired or altered in a way that has a significant impact on its protected or architectural value
  • Repair or alteration work relating to a building’s envelope or technical systems can have a significant impact on the building’s energy efficiency or its energy and environmental impacts throughout its entire life cycle
  • the intended use of the building or part thereof is substantially altered

The need for planning permission for repair and alteration works must also be assessed on a project-by-project basis, and this assessment is based on the building plans submitted to the building control authority.

Applying for planning permission

Applications for permits are submitted electronically via Lupapiste.

The following must be attached to the licence application

  • proof of ownership, demonstrating that you have control over the entire building site (a certificate of title less than three months old, a deed of sale, a tenancy agreement, etc.)
  • main drawings certified by the electronic signatures of the structural engineer and the lead designer
  • a design model at the level of the main drawings (models of the building and the building site) or data in a machine-readable format
  • in the case of projects other than buildings, a report on the construction project and its impact on the surrounding area.

The building control authority may require that the following be attached to the application, taking into account the nature and scope of the project, for example

  • a report on the ground conditions at the building site, the foundation method required by these conditions, and any other necessary measures
  • energy audit
  • construction products catalogue
  • report on the suitability of the building site and its elevation ratios
  • a report on the condition of the building in the area to be worked on, in the case of a renovation project.
  • any other essential information required to decide on the licence application

Measures prior to construction and the need for planning permission (Section 109)

In accordance with Section 109 of the Building Act, preparatory measures may be carried out prior to the commencement of building works, provided that such measures are preparatory to building works in accordance with the current plan.

Although no permit is required for these preparatory measures, the measures to be carried out must nevertheless be notified to the building control authority in accordance with Section 109 of the Building Act. Following receipt of the notification, the building control authority will verify whether the notified measures nevertheless require a landscape works permit.

Preparatory measures to be taken before construction work begins

  • digging, quarrying, felling trees and other similar preparatory work for construction, in accordance with the provisions governing landscape work permits
  • piling work for the building’s foundations
    • The piling plan must be approved by the structural/foundation engineer
    • A piling plan signed by the designer must be attached to Lupapiste
    • The site manager must obtain approval from the inspection engineer / supervising inspector before commencing the work

Notification of preventative works must be made by writing a message both in the project’s message field on Lupapiste and in an email to the permit officer. In addition, for piling works, you must contact the inspection engineer or the supervising inspector. You must not commence any preparatory work until the case officer or inspector has given their approval.

Landscape works permit

Earthworks that alter the landscape, the felling of trees and similar activities are subject to authorisation

  • within the area covered by the local plan
  • beach local plan for the area
  • within the area covered by the local plan, if so stipulated in the local plan
  • in an area where a building moratorium is in force for the purpose of drawing up a local development plan, or where such a moratorium has been imposed for the purpose of drawing up or amending a master plan.

Felling trees in an area designated in the local plan as being predominantly for agricultural and forestry use does not require a permit. It is advisable to check with the building control department before carrying out the work.

It is not necessary to apply for a landscape works permit if

  • this concerns the carrying out of works necessary for the implementation of a general or local development plan, or works relating to a building permit that has been granted
  • This concerns preparatory measures for a construction project relating to the implementation of a legally binding plan
  • The measure is based on an approved road plan in accordance with the Act on the Transport System and Roads, or an approved railway plan in accordance with the Railways Act.

Applying for a landscape works permit

Applications for licences are submitted online via Lupapiste

The following must be attached to the licence application

  • proof of title demonstrating that the applicant holds title to the property covered by the entire project (a title deed less than 3 months old, a deed of sale, a tenancy agreement, etc.)
  • the main drawings for the project, certified by the designer’s signature (often a site plan and, in the case of land formation, cross-sections as well)

The building control authority may also require other supporting documents to be attached to the application, taking into account the nature and scope of the project

Demolition permit

A demolition permit is required to demolish a building or part of a building

  • within the area covered by the local plan
  • within the area covered by the local plan, if the local plan stipulates that a permit is required
  • in an area where a building moratorium is in force whilst a local plan is being drawn up.

No licence is required if

  • it is an outbuilding or another minor structure of a similar nature, unless it is of historical significance or architectural value
  • An approved street plan or road plan requires the demolition of the building.

It is advisable to check whether a permit is required well in advance of carrying out the work. The property owner is obliged to notify the building control authority of any demolition work, even if a permit is not required. Following this notification, the building is removed from the local authority’s register and the information is also transferred to the national register (RYHTI).

Applying for a demolition permit:
Applications are submitted online via Lupapiste

The following must be attached to the licence application

  • proof of title demonstrating that the applicant holds title to the property covered by the entire project (a title deed less than 3 months old, a deed of sale, a tenancy agreement, etc.)
  • a site plan certified by the designer’s signature

The building control authority may also require other supporting documents to be attached to the application, taking into account the nature and scope of the project

Demolition notification:
Even if no planning permission is required for the demolition of a building or part thereof, the building control authority must nevertheless be notified of the demolition 30 days before demolition work commences. Within this period, the building control authority may, for justified reasons, require an application for a permit to be submitted.

A demolition notification is submitted via Lupapiste using the demolition permit application form. A site plan or map showing the building to be demolished must be attached.

Consultation with neighbours in connection with a planning application

Whenever a project is likely to affect neighbours, they must be informed about the construction project. Section 63.5 of the Building Act (751/2023, RakL) defines a neighbour as the owner or occupier of an adjacent or opposite property or other area. The occupier of a co-managed area within the same property, or a neighbour in a terraced or semi-detached house, is not considered a ‘neighbour’ within the meaning of the Act. In properties divided by a co-ownership agreement, the owners of other co-ownership areas are consulted as neighbours if, in accordance with the co-ownership agreement, the occupier of an individual co-ownership area may independently apply for the permits required for the measure.

Consultation with neighbours may be carried out by the authorities or by the applicant, either on paper or electronically.

Under Section 63.1 of the Building Act, the local authority must give notice of the submission of a building permit application and consult with neighbours, unless, taking into account the minor nature or location of the building project or the content of the plan, such notification and consultation are manifestly unnecessary in the interests of the neighbours.

If the applicant consults the immediate neighbours themselves, Section 63 of the Building Act (RakL)4 of the Building Act, the applicant may attach to their application a statement confirming that the neighbours, or some of them, are aware of the documents and information relevant to the project, as well as a statement regarding their possible views on the project.

The applicant must give notice of the pending planning application at the building site in accordance with Section 63(6) of the Building Act.

Procedure for consulting neighbours at the permit office:

  • Once the application has been submitted to the planning office, a notice must be displayed at the building site stating that the planning application has been submitted (Section 63(6) of the Building Act). A record of this (e.g. a photograph) must be included amongst the application’s attachments.
  • If it is necessary to consult neighbours as part of the project, the authority will indicate the neighbours to be consulted on the ‘Opinions’ tab of the application.
  • If the applicant has selected the option ‘The local authority will consult all neighbours’, the consultation will be carried out automatically by the local authority and invoiced in accordance with the current rates.
  • If the applicant consults the immediate neighbours themselves,
    1. The consultation may be carried out electronically via Lupapiste, provided the neighbours’ email addresses are known. The neighbour logs in to the project using strong authentication and is granted limited access to the application details. The neighbour records any comments they wish to make in their consultation response. If the neighbour wishes to be notified of the decision, this must be stated in their comments in accordance with Section 70.2 of the Building Act.
    2. The consultation may be carried out in the traditional manner using a paper neighbour consultation form, in which case the neighbour completes the form and the completed form, together with the material presented to the neighbour during the consultation, be attached to the application at the planning office. If the neighbour wishes to be notified of the decision, they must tick the relevant box on the form (Section 70(2) of the Building Act). When conducting a consultation on paper, it should be noted that all owners of neighbouring properties must sign the consultation form.

Frequently Asked Questions

When should you seek advice from the building control authority?

With the introduction of the new Building Act, many permit requirements have been abolished, for example in relation to various structures and canopies. We urge you to contact the building control department to seek advice before starting any building work if you are unsure whether a permit is required. This ensures that any necessary planning permission is applied for at the right time, and the building control department will not need to intervene through retrospective checks. A request for advice is free of charge and can be made via the Lupapiste service.

Further information on planning permission requirements can be found in the Tuusula Building Regulations and the explanatory notes to the Building Regulations, as well as in the local development plans.

You can find the current local plan, planning regulations and any building guidelines for your area on the Tuusula map service by clicking on the planning area.

Do I need planning permission to build a patio? What about glazing an existing patio?

No planning permission is required for the construction of an uncovered or covered terrace if the covered terrace is less than 50 m² in size (Section 42 of the Building Act). No planning permission is required to build an uncovered, or open, terrace, but the local town planning regulations must be taken into account during construction. For example, you cannot build on an area designated for planting without special permission. If the open terrace is large and situated close to the boundary, it would be advisable to discuss the matter with your neighbour before building.

No planning permission is required for glazing a terrace, provided that the glazing consists of clear glass and can be opened in such a way that at least 30 per cent of the walls surrounding the terrace are left open. Please note that the walls of the building bordering the terrace are also counted as part of the surrounding walls.

If the surface of the terrace is more than 50 cm above ground level, there must be a guardrail around the edge to prevent falls. In such cases, the glazing can be fitted in two parts, with the lower pane fixed and the upper pane openable.

Do I need a permit to install a ground-source heat pump system?

You will need planning permission to install a ground-source heat pump system.

When drawing up the project schedule, please bear in mind that construction work cannot commence until the planning permission has become legally binding (7+30 days from the date of the decision). It should also be noted that the installation of energy wells does not constitute preparatory work for a construction project as defined in Section 109 of the Building Act (RakL 751/2023). Nor can the right to commence works under Section 78 of the Building Act be applied to energy wells.

The construction of geothermal wells, like that of all drilled wells, involves environmental risks. If the wells are constructed carelessly, rainwater and surface runoff may enter the well and, from there, seep into the groundwater.

Under Tuusula’s building regulations, the installation of a ground-source heat pump system in a groundwater area or within the Päijänne Tunnel protection zone is prohibited without a water management permit in accordance with the Water Act.

You can find more detailed information about planning permission for a ground-source heat pump system here:

A glazed balcony – what planning permission is required?

Definition: A balcony is a space that has access (a door) to the interior of the property but from which there is no access to the courtyard. Balcony corridors are not considered to be part of a flat’s balcony.
You do not need permission to glaze a balcony if the building is not listed or unless the local plan stipulates otherwise. A condition for glazing is that the glass must be clear and that the glazing above the railing must be openable on at least one long side. However, please remember to comply with the Building Act and the regulations issued under it, such as fire safety regulations. Please note that glazing a balcony always requires permission from the housing association. The housing association may also have its own guidelines regarding balcony glazing.

How long does it take to get a licence?

Depending on the project, a building permit can be obtained in as little as a few days. In accordance with Section 68 of the new Building Act, ‘Processing of building permit applications’, a time limit has been set for processing permit applications, which is 3 or 6 months depending on the complexity of the project. A standard project is usually decided upon within approximately 2 months. The planning officer determines the complexity of the project.

The length of the planning permission process is significantly affected by whether all the necessary documents have been submitted for the project. Under the Building Act, the application must include main drawings, machine-readable data, a statement regarding control of the building site, and evidence of consultation with neighbours. If the information required by law is incomplete, the processing of the application will be delayed.
To streamline the planning permission process, we recommend – regardless of the scale of the project – that you request a preliminary meeting with the planning officer to ensure that the planning permission application is processed smoothly. The preliminary meeting will also cover the reports required for the application. This procedure is included in the planning permission fee.
The planning permission application becomes legally binding 7 days (public notice) + 30 days (appeal period) after the decision. The Building Control Committee decides on any requests for rectification. The Committee meets approximately once a month.

How long is the licence valid for?

A building permit is valid for five years from the date on which it becomes legally binding. Construction work must commence within three years of the permit becoming legally binding.

A planning permission for the site preparation stage is valid for three years, during which time an application must be made for planning permission for the construction stage and work authorised by the permission must commence.

We may extend the validity of a building permit or approval for the commencement of works by up to two years. We may extend the deadlines for the completion of works by up to three years at a time.

A landscape work permit (for felling trees, amongst other things) is valid for five years from the date on which the permit becomes legally binding. We may grant a permit for planned forest management for a maximum of ten years.

A demolition permit is valid for five years from the date on which it becomes legally binding.

Notice of demolition. Demolition must be carried out within five years of the notice of demolition being submitted.

A permit for the siting of a clean transition facility is valid for five years from the date on which the permit becomes legally binding.

Does a new sewage system require a permit?

You only need a building permit to construct a new property-specific sewage system or to make substantial alterations to an existing system in the following areas:

  • in groundwater and water intake protection zones
  • in an area classified as a beach area
  • Within the Päijänne Tunnel protection zone.

In other areas, no building permit is required for this measure. However, the work must be carried out in accordance with the Government Decree on the treatment of domestic wastewater in areas outside the sewerage network.

 How much does
the licence cost?

In Tuusula, we apply a per-square-metre charge for new-build projects in accordance with the Building Act, and the planning permission fee is determined in accordance with the approved rate.

In accordance with the schedule of charges, additional fees may apply if the building site is located, for example, in an area subject to planning requirements (outside a local plan area).

An example of the construction of a detached house and an outbuilding in an area covered by a local plan:

Detached house, 130 square metres:

  • Fee per building project: €620
  • €8.00 per square metre, based on the total area

A planning permission for a detached house would cost €1,660

Outbuilding, 65 k-m² (subject to planning permission):

  • Site-specific fee for an outbuilding: €300
  • €4.00 per square metre, based on the total area

The cost of a building permit for an outbuilding will be €560

Other costs involved in applying for planning permission:

  • Organising a kick-off meeting: €300
  • Marking out the site and site survey: €550

Total cost of the planning permission for the example project: €3,070.

We will invoice you for the planning permission fee once a decision on the application has been made. If the building project does not go ahead, i.e. construction work does not commence, you may apply for a refund of the permit fees in accordance with the building control charges schedule. In accordance with the schedule, the refund applies only to part of the permit fee.

Do you need a permit to fell trees?

You may fell trees on a plot of land or building site for a detached house without applying for a permit, provided the following conditions are met:

  • No more than five trees may be felled, and the number of trees remaining on the plot after felling must meet the requirements set out in the planning regulations. Unless otherwise specified in the plan, there must be at least one tree per 200 square metres of undeveloped area on the plot or building site.
  • The local plan does not contain any provisions regarding the protection of trees.
  • Trees do not grow in that part of the plot or building site where, according to the local plan, trees are required.
  • The trees are not of significant landscape value – for example, they are not stately old solitary trees, groups of trees or similar – the loss of which would have a substantially detrimental effect on the environment.
  • The neighbour’s consent is required to fell trees growing on the boundary.
  • A tree that poses a danger to its surroundings may be felled without a permit.
  • Felling trees should be avoided during the birds’ breeding season.

Section 8 of the Neighbourhood Relations Act (29/1920) grants the occupier of a plot the right to remove roots and branches extending from a neighbour’s property onto their own land if they cause a nuisance. The party experiencing the nuisance must first request the owner of the tree to remove the roots and branches. Only if the owner of the tree fails to comply with the request within a reasonable time does the party experiencing the nuisance have the right to carry out the work themselves. The aforementioned request should be made in writing and should specify a deadline for the requested action. The right to remove such features extends only up to the boundary line, not beyond it. The Neighbourhood Relations Act is enforced by the police, and disputes falling under the Act are settled by the District Court. Matters relating to the aforementioned Act do not fall within the remit of the building control authorities.

If you are planning to fell trees on a plot of land or building site other than a detached house plot or building site covered by the local plan, please contact the building control department. We will assess whether you need a landscape work permit. We will examine the planning situation and any other landscape impacts. Felling even a single tree may require you to apply for a landscape work permit. When felling trees, you must take into account the nesting peace of birds. For protected bird species, felling should be avoided between April and July. Before felling any trees, you must always check that there are no active bird nests in the trees to be felled or in their immediate vicinity.

Do I need planning permission to build a canopy onto an existing building?

A canopy measuring less than 50 square metres does not require planning permission. However, when erecting the canopy, you must comply with the planning regulations and any building guidelines, as well as the Tuusula Municipal Building Regulations. If, for example, the canopy is to be situated on a part of the plot designated for planting in contravention of the local plan, a planning exemption must be obtained for its location.

It is advisable to inform your neighbours before carrying out the work.

Do you need a permit to insulate a cold store?

You do not need a permit from the building control authority to insulate an existing cold store. Ventilation must be provided in the cold store.

Please bear in mind that, in the case of a housing association, thermal insulation always requires the permission of the housing association.

Do I need a planning permission to build a barrel sauna?

No planning permission is required to build a barrel sauna of less than 30 square metres, but you must comply with the local plan (local development plan or master plan) and other provisions of the Building Act. Outside a local plan area, the building must be situated at least four metres from the neighbour’s boundary. Within a local plan area, the distance requirements set out in the local plan must be observed. However, the minimum distance should be at least eight metres from buildings on a neighbouring building plot. The flue must be positioned above the lower edge of the eaves of the residential building if the sauna is situated less than eight metres from another building.

Before proceeding, it is advisable to inform your neighbours and agree on the location if the barrel sauna is to be situated very close to the property boundary.

Do I need a permit to install a solar panel?

You do not need a permit to install solar panels or heat collectors on the roof of a detached house, provided that the panels’ power output does not exceed 10 kW in accordance with the Building Regulations.

You will need a permit if the solar panels are to be installed on building façades or on the ground, if the building is of cultural or historical significance, or if the installation is a solar power plant.
Please note that if the building is situated within aircraft landing zones, you must first request a statement from Fintraffic Air Navigation Services Ltd to assess the risk of glare before installing solar panels. In Tuusula, aircraft landing zones particularly affect the areas of Sula, Maantiekylä, Lahela and Ruotsinkylä. You can view the landing zones in more detail on the Tuusula map service.

 Do I
need permission to repaint the façades?

You do not need planning permission to paint a façade. However, you must comply with the town plan regulations and any building guidelines that may have been drawn up for the area, as well as the colours specified therein.

If a building is of cultural and historical significance, the project requires planning permission.

Switching from oil heating to another form of heating

When you stop using oil heating, the oil tank must be emptied, inspected, cleaned and removed from the ground. If removal is not possible, for example due to the tank’s location, you must contact the Environmental Monitoring Department of the Central Uusimaa Regional Environment Centre regarding leaving the tank in the ground. The Environmental Enforcement Unit may, upon application, approve the tank being left in the ground. You must also contact the emergency services regarding the discontinuation of oil heating.

With regard to a new heating system (ground source heat pump, water-to-air heat pump, air-to-air heat pump), you should check with the building control authority whether a permit is required.

Contact details

Before contacting us, please check the map above to see whether a specific inspector has been assigned to that area.

Anne Savolainen

Licence inspector
Growth and the environment
Rakennusvalvonta
Telephone hours are Monday 12 noon to 1 p.m., Tuesday 12 noon to 2 p.m. and Thursday 9 a.m. to 11 a.m. Please send call requests by email .

Lena Grönhage

Licence inspector
Growth and the environment
Rakennusvalvonta
+358403143597
Telephone hours are Mondays from 12 noon to 1 p.m., Tuesdays from 12 noon to 2 p.m. and Thursdays from 12 noon to 2 p.m. Please send call requests by email.

Johanna Aho

Head of Building Control
Growth and the environment
Rakennusvalvonta
+358403143592
Telephone hours are 8–9 a.m. and 1–2 p.m. on Thursdays.

This content has been translated using AI