Häriskivi
The search for plots in Häriskivi, South Tuusula, is ongoing. Take a look at the plots and apply for one in Häriskivi!
We are constantly looking for new applicants and, as a rule, we allocate plots in the order in which applications are received, but in accordance with the selection criteria. Read the application instructions and criteria and apply for a plot! If necessary, you can contact the contact person listed on this page.
The Technical Services Desk provides assistance with questions and enquiries relating to construction, planning regulations and building permits.
Häriskivi plots
Available plots are marked in green on the map view. Click on a plot to view its basic information and prices. You can also view Häriskivi plots and other available detached house plots on the Tuusula map service.(switch to another service)
Häriskivi plot material
This section lists the most important materials relating to the Häriskivi plots.
Please note that building on mini plots requires consent from neighbouring plot owners for construction close to the plot boundary and, in some cases, building easement agreements.
Häriskivi usage rights/encumbrances
The following easement agreement applies to plots 1 and 2 in block 2606:
Plot 5 of block 2619 is subject to an unregistered building easement agreement between plots 5 and 6. A disused Caruna
electrical cable runs through block 2619. The plot recipient is responsible for removing the electrical cable from the plot area. The measures must be agreed in advance with Caruna. A Caruna power cable may run
through plots 2 and 5 in block 2606. The plot acquirer is responsible for removing or relocating the power cable from the plot area. The measures must be agreed in advance with Caruna.
Häriskivi soil
The municipality of Tuusula has conducted general soil surveys on some of the plots or in their vicinity for the purposes of land use planning and municipal engineering construction. When applying for a building permit, the plot recipient must submit a more detailed soil survey and foundation method survey for the specific building site. The plot recipient must note that responsibility for the foundation method lies with the plot recipient/builder and not with the plot transferor.
During the construction of municipal engineering works, it has been found that the previously estimated rock surface may consist of large boulders. When reviewing ground surveys and planning earthworks, the type of termination (“stone, boulder or rock”) must be taken into account.
Particular considerations in the KVV design of Häriskivi
The pressure level in Hyrylä is 90–110 mmp, and Miilunvartijankuja and Vesito inmäki may require property-specific pressure increases, especially if building on the highest point of the plot and the building has several floors.
If necessary, you can contact Tuusulan vesi (Tuusula Water).
Häriskivi municipal engineering readiness
The municipal engineering for the area is complete. Construction can begin immediately.
Plot maps
Instructions for searching for a plot
More detailed instructions and information about the application process and contract terms can be found on the page “Information for applicants for fixed-price detached house plots”.
See also “Selection criteria for recipients of detached house plots”.
Plots can be applied for during the specified application period, primarily using the electronic application form. You can find all application forms on the page “Application forms for detached house plots”.